Brief Description: Pulley assembly and flaperon mixture arm
I got the buggered Cherry rivets out that I mentioned yesterday lickity split thanks to some online advice.
The back-ordered bag of hardware came so I finished riveted the baggage floor on each side with the four AD 48-9 rivets.
I deburred, primed and riveted together the pulley assembly and the the flaperon mixture arm, but had to stop because I didn't have any wheel bearing grease at the hangar, where it was -9 upon arrival.
Added the four pulled non-CherryMax rivets on each side