KitLog pro

Powered By Kitlog Pro v2.0

Barry's RV14A
' style=
Date:  1-24-2024
Number of Hours:  2.50
Manual Reference:  N/A
Brief Description:  Flyleds Strobe Controller Wire-Up...

After mulling over the schematics to ensure I was on the right pathway, I finalized the connections for the left & right strobe & position lights. Testing with a low current 9v battery verified everything was as it should be. Since the wiring terminates to a 15 pin Dsub connector, I had to step down the 18gauge wiring to 20 gauge & add a shielded ground feed.

Onto the tail position light, etc.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.