KitLog pro

Powered By Kitlog Pro v2.0

Barry's RV14A
' style=
Date:  1-2-2024
Number of Hours:  1.00
Manual Reference:  Sect. 49
Brief Description:  Sniffle Valve....

Jameson & I installed the sniffle (fuel) drain valve & hoses. Routed the outflow hose into the fuselage tunnel per section 49 of the plans. Currently awaiting the delivery of an oil quick drain valve from Aircraft Spruce. Once received, I will drain the preservative oil from the engine & install the valve; then service the engine mineral oil per Lycoming's recommendation.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.