KitLog pro

Powered By Kitlog Pro v2.0

Barry's RV14A
' style=
Date:  3-11-2020
Number of Hours:  3.00
Manual Reference:  Sect. 12
Brief Description:  Began Right Elevator Fairing - See Notes to Right

1.) Sanding, grinding & fitting fairing to right elevator

2.) Fabricated to fairing ribs from lightweight foam

3.) Match drilled #40 hole to fairing
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.