KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  1-27-2006
Number of Hours:  12.00
Manual Reference:  8-15
Brief Description:  Cabin Systems Work

Began work on routing brake lines. Fabricated 2 isolation blocks. Bent left brake line to fit as shown in drawings and tested fit with landing gear mount. Inserted right brake line in isolation blocks and did preliminary bending. Did preliminary bending on left side fuel drain line. Cut holes in both sides for fuel drain penetration points and mounted hardware.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.