KitLog pro

Powered By Kitlog Pro v2.0

N905AD Web site
' style=
Date:  11-5-2006
Number of Hours:  8.00
Manual Reference:  10-1,6
Brief Description:  Mounted Landing Gear

Rechecked all tires - seem to be holding pressure. Lifted front of aircraft with hoist to allow for insertion of main gear legs. Greased gear legs and inserted into fuselage and inserted bolt into gear leg mounts. Inserted nosewheel gear leg into engine mount and installed bolt from inside of cabin and secured with a bolt. Installed WD-631 onto nosewheel gear leg and secured with bolt. Greased and installed nosewheel bearings and axel hubs. Then inserted hosewheel into nose wheel fork and installed the nosewheel axle bolt. Then inserted nose wheel fork onto nosewheel gear leg and secured with spring and nut. Need to get a spring scale for setting nose wheel breakout tension. Prepped both nose fairing supports, ready for priming. Also ready to install brake lines.
' style=

On Gear Legs

On Gear Legs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.