Powered By Kitlog Pro v2.0
Alans Web Site
Zenith CH601 XLB
Fuselage
4-10-2011
< Previous Log Entry
Next Log Entry >
Date:
4-10-2011
Number of Hours:
4.00
Manual Reference:
6-W-0
Brief Description:
final drilling for A4 and A5 rivets drill rudder b
final drilling for A4 and A5 rivets. drill rudder brackets 5/16 centre hole for tie down eye and 4 @ 3/16 holes. .
All drilled, ready to dissassemble for corrision proofing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zenith CH601 XLB Home
Category
# Logs
# Hours
All
145
404
Empennage
17
62
Engine
16
41
engine management
6
13
firewall
4
6
fuel tanks
4
8
Fuselage
9
28
ignition system
2
3
instrument panel
13
41
kit inventory
4
17
left wing
27
68
Miscellaneous
1
2
None
4
17
nose gear strut asse
3
2
right wing
23
60
Tools
1
2
wing updates
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.