KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
' style=
Date:  3-13-2021
Number of Hours:  8.00
Manual Reference:  Step 68
Brief Description:  Inspection hole doublers

Step68: Corrosion-Proof the Doubler sand Rivet the Nutplates to Them

Apply the corrosion-protection of your choice to the doublers (transferring the
location and orientation marks as necessary). Then flush-rivet a K1000-08 nutplate
at each screw hole, with the rivet heads on the undersides of the doublers.

Now we inverted the procedure:
1) drill the rivet holes of the nutplate using a drill gauge.
2) countersink for the flush head
3) light abrasion of the surface using scotch brite
4) cleaning with acetone
5) applying a primer

We used zinc phosphate primer

Next step is the riveting of the nutplates
' style=

Drilling the holes for the nutplates

Drilling the holes for the nutplates

' style=

Corrosion proofing

Corrosion proofing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.