Powered By Kitlog Pro v2.0
HB-YAK GS-2 Sportsman 2+2 kit
Sportsman 2+2
All
11-6-2021
< Previous Log Entry
Next Log Entry >
Date:
11-6-2021
Number of Hours:
2.00
Manual Reference:
Step 106
Brief Description:
Mount the Header Tanks
Step 106: Mount the Header Tanks and Route the Fuel
Lines From the Left Wing to the Drain Valve
Headertanks are lower to allow the Pilar Point sensors to be installes above.
Using two gascolators, one per side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2+2 Home
Category
# Logs
# Hours
All
343
1748
Avionics
9
38
Empennage
6
34
Engine
51
288
Final assembly
126
535
Fuselage
37
94
Miscellaneous
13
235
Prop
5
20
Shop Supplies
1
8
System Installation
23
92
SYSTEMS INSTALLATION
23
92
Wings
49
312
Copyright © 2001-2024 Matronics. All Rights Reserved.