KitLog pro

Powered By Kitlog Pro v2.0

HB-YAK GS-2 Sportsman 2+2 kit
' style=
Date:  6-9-2021
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Right wing; Fuel transfer pump installation

Pre-drill the douber, put in place and drill/cleco.
Then prime the part for corrosion proofing.
Then rivet the doubler to the lower skin of the wing.
I was alone and bucked the rivets by myself.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.