Deburred and scuffed the tie down assemblies to prep for priming.
Fabricated a doubler out of the AS3-063x1-1/4x12 aluminum strip. This was fabricated as per Van's technical dept/engineering suggestion for the oblong screw hole on top of the right spar. This error was documented on the log entry of 9/3/20.