KitLog pro

Powered By Kitlog Pro v2.0

Tony’s RV-7
' style=
Date:  9-28-2020
Number of Hours:  6.80
Manual Reference:  Section 7
Brief Description:  Tie Down hardware

Left & Right tie down brackets, drilling and deburring. Building spacers for tie down brackets.

The following tasks were done:
* Make the two W-726 spacers, but leave them un-drilled.
* Clamp the W-731 and W-726 spacers to the spar and slip a bolt through the location hole and the hole in the spar.
* Align the W-731 and back drill all the bolt holes through the spar.
* Remove the tie-down and spacers from the spar, cleco or bolt them together and drill the holes for the platenut rivets.
* Use a platenut as a drill guide. Machine countersink the W-726 spacers,
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.