Brief Description: Preparing horizontal stab. surfaces for bonding
All bonding surfaces have been sanded with 40 grit sandpaper. Skin was fitted against rest of the horizontal stab and once everything was aligned, holes were drilled in L/E through both lower and upper skin and clecos were installed. This will be method of holding sections in alignment during cure. When drilling holes, attention was necessary so as not to drill holes into ribs.