KitLog pro

Powered By Kitlog Pro v2.0

ProBuilder Legacy
' style=
Date:  9-24-2007
Number of Hours:  2.00
Manual Reference:  Chapter 2, Sec. F
Brief Description:  Preparing horizontal stab. surfaces for bonding

All bonding surfaces have been sanded with 40 grit sandpaper. Skin was fitted against rest of the horizontal stab and once everything was aligned, holes were drilled in L/E through both lower and upper skin and clecos were installed. This will be method of holding sections in alignment during cure. When drilling holes, attention was necessary so as not to drill holes into ribs.
' style=





' style=

Holes for allignment

Holes for allignment

' style=

Holes for allignment

Holes for allignment

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.