KitLog pro

Powered By Kitlog Pro v2.0

Richard's Web Site
' style=
Date:  10-31-2015
Number of Hours:  3.00
Manual Reference:  Step 189
Brief Description:  Install Vertical Stabilizer Root Fairing

the drawings for Step 189 were not completely labled so you have to look at the the next couple of pages to determine the bolt sizes and some of the parts.

Pic 2 shows and almost completed fairing. I had to order FU221 R and L.

Pic. 3 My missing part list today was a long one. I spent an hour compiling this to send to Lockwood.
' style=

Manual reference

Manual reference

' style=

Almost completed fairing.

Almost completed fairing.

' style=

Compilation of missing parts list

Compilation of missing parts list

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.