Tonight I got resin mixed up for the weight well and got that done with one bid. So since I had the cups with resin and micro I got the ends of the elevators cut and one bid wet out on them. They will now mach the fuselage curve. The trim system will be next in order and I will look this up as to how it goes.
Snow is here!! 5"/ 12 cm heavy stuff. Plowing the driveway got some of my time tonight. Zenon did the sidewalks and thanks for that Zenon!!