Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
All
3-16-2015
< Previous Log Entry
Next Log Entry >
Date:
3-16-2015
Number of Hours:
1.00
Manual Reference:
6.8.2
Brief Description:
Fuselage and dog house clean up
I trimmed the bid on the dog house tonight and sanded the edges up. The fuselage was also sanded on the dog house face.
Peel-ply came off the Instrument panel flanges to fuselage. Lay-ups were perfecto, the heat gun is a must to flow out bubbles.
Dog house bid trimmed and sanded
Fuselage bid sanded.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.