It was time to move things around in the shop again. I removed the Pilot wing and stowed it in the ceiling again. I used ropes and pulleys to help me to do this. Once away the fuselage was moved and the Co-Pilot wing came down. The plane was leveled and the wing bolted on. The incidence was checked and the level on the plane was done one more time. It is ready to have the top strake floxed in now. I ordered Flox and Cab-o-sil for the resin just to make sure I have enough for the job. I can now start the prep work by sanding cleaning and painting resin. I am glad that there it time this summer to keep building. My goal is to have this all done and the wing sanding to primer done by freeze up in November. It’s a dream but I must push forword.