|
|
|
|
Todd's Web site
|
Date: 3-19-2011
|
Number of Hours: 7.50
|
Manual Reference: 8-55 & 56
|
Brief Description: Empennage Attachment #4
|
|
-Centered the vertical stab and leveled it fore and aft per the plans -Drilled the eleven holes in the F--884 attach plate, spacer, and front spar of the stab -Final drilled #12 the 4 holes that attach the F-884 plate to the front spar of the horiz stab] -Un-cleco'd the front spar, spacer, and plate, and scuffed, cleaned, and primed the parts -Riveted the parts together and bolted the attach plate to the horiz stab -Attached the elevators, clamped them in trail, and determing the size of spacers needed between the elevator horns and the center bearing. - Removed the elevators, and re-installed with the appropriate spacers. -Again, clamped the elevators into a neutral trail position -Marked the pushrod attach bolt hole in the most rearward horn (to ensure edge distance in the other one). -Drilled the hole to #30, then to #12 -made a hardwood block that fits snug between the horns and drilled a perpendicular hole though it on the drill press, I then clamped it into place between the horns and used it as a drill guide for the hole in the opposite horn. -Removed the block and deburred the holes -Time to install the elevator control system...
|
|
Drilling the holes in the vertical stab front spar
|
|
Drilling the holes in the elevator control horns
|
|
Vertical stab and elevators installed!
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |