KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web site
' style=
Date:  7-2-2010
Number of Hours:  3.50
Manual Reference:  8-29/30
Brief Description:  Drilling Fuselage #12 (Disassembly)

-Put the fuse back up on the work tables
-Removed the upper longerons
-Uncleco'd and removed all of the parts of the tailcone in the reverse order that it was installed
-Re-cleko'd the F-822 floor skin to the center section and positioned the forward fuse so the aft end was hanging over the table
-Machine countersunk all the holes in the F-822 floor skin that connect to the forward and aft flanges of the center section.
-Removed the left forward side skin to gain access for fitting and drilling the Fuel Valve bracket.
-Fit and drilled the fuel valve bracket in place IAW the plans, carefully keeping an eye on edge distance requirements.
-Unbolted/un-cleko'd and removed all unriveted parts on the fwd fuse sub structure.
-Time for countless hours of countersking, deburring, dimpling, scuffing, and priming....
' style=

Fwd Fuse sub structure on the table with the aft end overhanging...

Fwd Fuse sub structure on the table with the aft end overhanging...

' style=

...in order to countersink the center section holes from the bottom

...in order to countersink the center section holes from the bottom

' style=

Fuel valve bracket in place.

Fuel valve bracket in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.