KitLog pro

Powered By Kitlog Pro v2.0

Todd's Web site
' style=
Date:  1-28-2007
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Left Fuel Tank #2 - Fabrication (1 of 2)

Finished installed the nutplates on the z-brackets and installed them onto the spar.

Had to debur, straighten, and flute the 7 wing tank ribs. Assembled the fuel tank in the cradle. The fuel tank is .032 T6 and alot tougher to squeeze the ribs into the nose and line up all the holes. It's a real wrestling match.

Installed the rear baffle onto the fuel tank. I'll continue this on the next log so I can have more pics.
' style=

Z-bracket installed on spar (left center bolt out for now)

Z-bracket installed on spar (left center bolt out for now)

' style=

All the z-brackets installed

All the z-brackets installed

' style=

Assembling fuel tank in the cradle.

Assembling fuel tank in the cradle.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.