KitLog pro

Powered By Kitlog Pro v2.0

Tims Lightning XS
' style=
Date:  8-12-2017
Number of Hours:  1.75
Manual Reference:  17.2, #1-8
Brief Description:  Horizontal Stabilizer - 3

Took lots of block sanding to get the back edge of the HS straight. This is important b/c the elevator will ride in this channel.

I used a wooden dowel the length of the width of the VS to space the leading edge while sanding. Then I bolted the spars together.
' style=

Still a bit to go. This needs to be straight.

Still a bit to go. This needs to be straight.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.