Brief Description: Right leading edge prep and paint
Dimpled the leading edge J stiffener, ribs and fuel tank attachment strap. Alumipreped and alodined the parts. While they were drying I dimpled the leading edge skin. Once all was dry the skin was wiped down with Acetone and all parts were painted with two part epoxy paint. Final assembly will be tomorrow. I had enough paint left over to paint the inside of the two 8' wing push tubes and 24" steel control tube. This will give them a couple weeks to cure out.