Started assembly of the right leading edge this morning. All went together very well. After all was clecoed, I started riveting the ribs starting with the two most aft located rivets on each rib. I was able to squeeze the first three rivets on each rib and bucked the rest. Because I need assistance holding the leading edge in place, I set the leading edge aside for installation on Monday. Fuel tanks are next.