KitLog pro

Powered By Kitlog Pro v2.0

Sonex 825 build log
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-17-2012
Number of Hours:  4.00
Manual Reference:  SNX-L01
Brief Description:  Setting Toe in and drilling axles

I got the legs mounted and the axles rigged for toe-in. I needed to use some spacers to clear the weldment but it was easy enough. In the picture you can see how I had the left leg rigged. I got the axles drilled, brakes mounted, and bearing packed with grease and tires mounted. Gear are basically done but I need to order a longer brake cable.
' style=

.07 degree toe-in

.07 degree toe-in

' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.