Sonex 825 build log
Sonex
Empennage
25 Logs Found
Date
Hours
Work Log Summary
Details
01-02-2012
1.0
Adjust tail fairing
Details
12-06-2011
2.0
TAIL IS DONE!!
Details
12-05-2011
2.0
Tail fairing brackets
Details
12-04-2011
2.0
Tail filing for rudder and fairing cuts
Details
11-30-2011
5.0
Permanently mounted the tail
Details
11-29-2011
0.5
Paper outline of tail fairing done.
Details
11-28-2011
2.5
Rear channel riveted and no warp!
Details
11-27-2011
3.0
Vertical tail drilled and a small oddity
Details
11-27-2011
1.0
side warp fix (possibly)
Details
11-25-2011
5.0
Horizontal Stab bolting, vertical mock up
Details
11-19-2011
1.0
Tail is done, now on to the fuselage
Details
11-18-2011
2.0
Final stab hinge location
Details
11-15-2011
2.0
Adjusting elevator hinge and fitting tail
Details
11-14-2011
1.5
Tail tips and horizontal stab skin
Details
11-13-2011
4.0
Skinned left stab and rigged elevators
Details
11-12-2011
6.0
Elevators start to finish
Details
11-11-2011
8.0
Skinned right horizontal stab and started elevetor
11-10-2011
5.0
Horizontal Stab spars done and mock up
Details
11-09-2011
4.0
Horizontal Stab spars
Details
11-08-2011
3.0
Horizontal Stab ribs and angles
11-07-2011
1.0
T04 is done man!
11-04-2011
1.5
Horizontal Stab small rib
11-03-2011
2.5
Control Horn and Skins
Details
11-02-2011
3.0
Elevator control horn
Details
11-01-2011
3.0
Parts prep and inventory
Details
SITE NAVIGATION
Contact Builder
Sonex Home
All
Canopy
Controls
Cowling
Empennage
Engine
Firewall Foreward
Fuselage
Gear
Miscellaneous
Paint
Panel
Shop Supplies
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.