KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  11-22-2014
Number of Hours:  0.00
Manual Reference:  
Brief Description:  AeroVee Engine Assembly - 2nd Crankshaft Kit

I picked up my 2nd crankshaft kit on 11/21/2014.

After setting the crank into the crankcase half I have made the following measurements:

Prop hub flange face runout: .004"
Prop hub shaft runout: .005"

Install flywheel & determine shim stack height.

Crank end gap is .064 to .068 (this is not looking good, may have the same issues as I had with the original crank).

Use full shim stack of 5 as provided in kit, which measures .056" for a calculated end play of .008" to .012:"
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.