KitLog pro

Powered By Kitlog Pro v2.0

Rob and Haruko RV-12 N73HR
' style=
Date:  11-20-2010
Number of Hours:  8.00
Manual Reference:  24-02-24-05, 40-11
Brief Description:  Rollbard Assembly and baggage bulhead preparation

Prepared wiring for the Cabin LED light mounted on the rollbar (Section 40) and drilled associated holes. Riveted rollbar for aft aft channels to rollbar straps.Attached rollbar mounting brackets to fuselage and fit rollbar. Match-hole drilled rollbar to mount brackets, then disasemebled, prepped, and primed the mound brackets (mallied out of solid aluminum, therefore needs primign). Re-assumbled and riveted rollbar to mounting brackets, and riveted support brackets.

Prepped the baggage buldkeads, clecoed to the tailcone, and match-hole drilled bulkheads to shear clipls. Dimpled baggage bulkheads and bulkhead channels for nutplates.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.