Brief Description: final drilled and countersinked rollbar
final drilled the #40 holes to #30 holes on the fuslelage rollbar and drilled the wiring hole for the cabin lighting LED. Removed clecoes and machine countersinked the outside holes (need to be flush for the canopy). Deburred all the drilled holes. The rollbar didn't look like the normal alclad, so I scotchbrite roughed-up the inside surfaces and primed.