KitLog pro

Powered By Kitlog Pro v2.0

Peters Web Site
' style=
Date:  2-2-2020
Number of Hours:  1.50
Manual Reference:  9225501-LOG-06.024
Brief Description:  1: Engine Controls and Cable Doubler

An awesome day out here in the desert today for building aeroplanes. A lot of rain yesterday brought some relief from the heat, and the temperature today stayed under 30C all day, so I made the most of it.

First up I set about finishing off the jobs that I started yesterday. I fitted my new centre tunnel cover plate, and ran in the engine control cables. I'm going with a fixed pitch propellor, so I just have throttle, mixture and alternate air controls to worry about.

Next up I rivetted my cable clamp doubler plate to the inside of the firewall (second picture below), then on the front side I fitted a couple cushion clamps to the main power cables.
' style=

Centre tunnel cover installed, and engine control cables fitted

Centre tunnel cover installed, and engine control cables fitted

' style=

Another doubler plate rivetted to the inside of the firewall

Another doubler plate rivetted to the inside of the firewall

' style=

With the doubler plate installed, I could then clamp the main power cables

With the doubler plate installed, I could then clamp the main power cables

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.