Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
12 Fuel System
Work Logs Found:
26
Category Work Time:
64 Hours
Date
Hours
Work Log Summary
Details
02-25-2024
2.00
2: Fuel Tank Pressure Test
Details
01-28-2024
5.00
1: Calibrating Fuel Tanks and Fuel Pump
Details
01-01-2024
4.00
1: Calibrating Fuel Tanks
Details
12-31-2023
0.00
2: Calibrating Fuel Tanks
Details
12-31-2023
5.00
1: Calibrating Fuel Tanks
Details
04-09-2023
5.00
Fuel Lines
Details
01-07-2022
1.00
3: Fuel Level Sender Wiring
Details
01-04-2022
3.00
1: Fuel Tank Vent Lines
Details
07-18-2021
0.50
4: Fuel Flow Sensor Mounting
Details
02-22-2020
0.50
2: Firewall Forward Fuel Line
Details
02-02-2020
1.00
3: Fuel Flow Sensor
Details
01-27-2020
3.00
4: Fuel and Brake Lines
Details
10-12-2019
1.00
3: Right Fuel Tank
Details
10-09-2019
2.00
2: Left Fuel Tank
Details
10-09-2019
1.50
1: Left Fuel Tank
Details
10-21-2018
1.00
1: Fuel Flow Sensor Bracket
Details
10-20-2018
2.00
3: Fuel Lines and Other Small Jobs
Details
10-20-2018
2.00
2: Red Cube Mounting Bracket
Details
09-16-2018
5.00
1: Installing Custom Fuel Lines
Details
09-15-2018
2.00
6: Fuel Boost Pump Cover
Details
09-15-2018
1.00
5: Fuel Vent Screens
Details
08-12-2018
4.00
1: Installing the Fuel Pump
Details
08-11-2018
6.00
Installing the Fuel Pump
Details
08-10-2018
2.00
Installing the Fuel Pump
Details
07-15-2018
3.00
Right Fuel Vent Line
Details
07-14-2018
2.00
1: Andair Fuel Selector Valve
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
932
2111
01 Workshop
10
02 Tools
24
4
03 Empennage
143
320
04 Wings
84
236
05 Fuselage
137
380
06 Firewall
33
79
07 Engine/Propellor
112
292
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
33
86
11 Instrument Panel
68
183
12 Fuel System
26
64
13 Canopy
69
165
14 Landing Gear
15
44
15 Cockpit Interior
20
46
17 Painting
1
3
28 CofA
2
4
29 Regulatory
2
11
49 Miscellaneous
35
6
50 YMTG Hangar
51
Copyright © 2001-2024 Matronics. All Rights Reserved.