A late start today, but once I got going then it was all fun. I put the dreaded centre rib/sub-panel section together first, and with my small modification of yesterday then this wasn't so dreaded anymore. It went together quite easily. I revietted the small angle bracket that holds the two parts in place, and then clecoed the rest of the assembly together.
With the whole front deck assembled, then I riveted the map box support braces in place, and then also glued some dense drawer liner material to them to create a snug fit for the box.
I refrained from rivetting the front deck together for now as I still haven;t done my brake and fuel lines, and I think these will be easier to work on without the deck assembly in place.
The front deck assembled
Some padded cushioning for the map box support braces