KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
' style=
Date:  11-2-2008
Number of Hours:  2.00
Manual Reference:  6-12
Brief Description:  First attempt rolling leading edge of elevator

Rolled portion of the leading edge on the right elevator per directions in plans (duct tape and 1" pipe). Was unable to achieve an acceptable lap joint. Will try an alternate approach.

Pictures attached show the basic rolliing tool fabricated for one segment of the elevator leading edge. Following log entry shows tool attached to elevator skin.
' style=

1

1" Conduit & Steel Bar

' style=

Conduit & Bar Match Drilled

Conduit & Bar Match Drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.