Brief Description: Prepared starbaord wing for bottom skin install
Prepared the starboard wing for attachment of botton skins. The NACA duct was primed and prepared for riveting. I plan to seal it with some tank sealant before riveting. I can back rivet all but one river. The final one will require a blind rivet.
I placed the carpet pads into all the wing bays to protect the upper skins if I drop the bucking bar (almost certain).
Tomorrow the plan is to finish the NACA vent and begin riveting the bottom skins.