9-29-2020
< Previous Log Entry
Next Log Entry >
Date:
9-29-2020
Number of Hours:
4.00
Manual Reference:
Brief Description:
Rivet Filling
Kerry & I rotated the fuselage this morning then we were able to fill all the rivets on the right side, this is quite a fast method of rivet filling, thank you Simon.
Bottom side ready for filler sanding
Rotisserie is very handy
This side filled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Sling 2 Taildragger Home
Category
# Logs
# Hours
All
921
3607
Avionics
92
365
Canopy
17
62
Electrical
47
181
Electrical Connector
7
Empennage
37
120
Engine
46
118
Firewall Forward
20
75
Flight Controls
73
253
Fuel System
14
40
Fuel Tanks
6
30
Fuselage
316
1450
G3X Interconnect Log
10
Inspections
2
Lights
4
21
Miscellaneous
20
9
None
6
Paint
23
79
Seats
7
27
Service Bulletin
3
8
Undercarriage
28
115
Upholstery
12
41
Wings
124
603
Workshop Setup
7
10
Copyright © 2001-2024 Matronics. All Rights Reserved.