Spent today deburring ribs 'n things. I'll need to source some grommets tomorrow as not enough were supplied in the kit, the routing of the pitot/AOA tubing has changed since my kit was produced & I'll need to drill some holes in some ribs to allow the tubing to pass through hence the need for grommets. I'll also need to open up some existing holes in one or two ribs I've already alodined.