In this work session I riveted the right wing leading edge.
In my last work session, I completed completed clecoing together the leading edge tanks, and then test fit them to the wing. I noticed that I've been running short of clecos, so I purchased 200 more of them. At a cost (including shipping) of about $0.50 apiece, including lost time for shipping. I thought that this was a backwards way of building the plane (pin everything together, then start taking it apart and deburring it).
So I thought it would be a good plan to "liberate" a good number of clecos by riveting up the leading edges to their ribs (except for the inboard rib, which will be completed later). I was able to get the leading edge riveted together a lot faster than the left leading edge, which I completed earlier.