KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  3-1-2008
Number of Hours:  6.00
Manual Reference:  Prep Rt Elevator
Brief Description:  Preparing Right Elevator

Clecoed and drilled E-601PP and E-611 PP to E-702 Spar.

Prepared E-703 end ribs and E-704 Counterbalance Ribs.

Drilled #12 holes for counter weight mounting screws. Clamped counter weight to the drill press and aligned ribs with a level. Cutting/Drilling lead is like cutting butter. Hot lead goes everywhere.

Drilled #19 hole in the center of E-610 PP’s for a #8 screw and ground straps. Drilled #40 holes for rivets holding Platenuts in place.

Instructions call for machine countersinking #40 holes E-709 Root Rib to E-702 Spar, but I will dimple the holes instead.

Cut out RH E-714 Counterweight in accordance with (IAW) E-714 Trim Detail on drawing 5.

E-701-R clecoed on under structure.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.