Riveted the top outboard skin of the LH wing. Back riveted all rivets except the ones on the bottom. Those I could get to with the squeezer.
Primed the outboard 2 inches of the top inboard skins where they are overlapped by the outboard skin. Primed the LH with the skins in place. Primed RH off of the structure
Removed five of the rivets from the skin which were sitting proud. I'll install replacement oops rivets tomorrow.
I also started installing the wiring conduit in the LH wing. Starting from the center I ran the conduit through the seven most inboard ribs.