KitLog pro

Powered By Kitlog Pro v2.0

Karl Richcreek's RV8 Web Site
' style=
Date:  8-14-2008
Number of Hours:  6.00
Manual Reference:  6-12
Brief Description:  Elevator finishing

Left elevator leading edge rolled and riveted.
Tried screwing in trim access plate. One screw broken; drilled out. Ordering stainless steel screws.
Installed rod end bearings left and right elevator. 13/16" spacing.
Drilled HS bracket holes to #12 for AN3-7A bolts.
Trim 1 1/8" from HS-801PP right skin to clear elevator horn.
Trim 9/32" from HS rear spar HS-603PP.
Right elevator aligned with HS.
Pilot drilled WD-605-1-R elevator horn to #40.
Removed right elevator. Final drilled WD-605-1-R to 1/4".
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.