KitLog pro

Powered By Kitlog Pro v2.0

Joe's OneX #129 Project
' style=
Date:  11-26-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Worked trying to adjust the elevator up limit

Trying to adjust the elevator up limit to what the plans call for. I am having to remove edges from the longerons at the very end of the fuselage to allow the nut and bolt head clearance. Also having to remove a lot of material from the top VS mounting angle to also allow clearance for the elevator horn attach bolt and nut. I think some Sonex re-engineering in this area is called for.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.