Powered By Kitlog Pro v2.0
Jean RV6 Construction Log
RV6
Empennage
4-30-2024
< Previous Log Entry
Next Log Entry >
Date:
4-30-2024
Number of Hours:
3.00
Manual Reference:
Brief Description:
Rigging the elevator Bellcrank
As mentioned yesterday, I have installed my 2 elevators and ensured that everything fitted together. Then I drilled the bellcrank , made the spacers so the push tube would be pretty much stuck & center between the 2 bellcranks. All worked as hoped !
One of the two pivot point
Center pivot point where the 2 bellcranks meet
Push tube and bellcrank not connected
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV6 Home
Category
# Logs
# Hours
All
405
2752
Cowling
24
221
Empennage
27
134
Engine
19
127
Fuselage
142
1169
Instruments
34
297
Other
2
18
Propeller
7
39
Wings
150
747
Copyright © 2001-2024 Matronics. All Rights Reserved.