KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
' style=
Date:  10-3-2021
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Many errands in preparation of riveting

This weekend I did many little things ... deburring holes, dimpling, priming parts of my dismantled top fuselage. I also installed the ADAHRS support, the ELT tray, etc... I have also drilled many nut plates as well !

One thing I wanted to do was to add a quick access to the ELT and the bellcrank behind the rear baggage wall. I made a hole 8" X 8" and hinged it at the bottom and made a stop/support and holding the door closed with 2 screws. The result is what I wanted. Quick access , big enough to peak behind !
' style=

door open with a view from the inside

door open with a view from the inside

' style=

back side view

back side view

' style=

Closed door.

Closed door.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.