KitLog pro

Powered By Kitlog Pro v2.0

Jean RV6 Construction Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-25-2024
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Nutplates & empennage installation

Today I finished installing the nut plates on fiberglass tip. Then proceeded to install the empennage, at least have the holes drilled so at the airport the reassembling will be much faster.

But before drilling, you check it 10 times so no mistakes can occur. Hence why it took me so long to get it going !

Last I even tried the Vertical stabilizer ! It starts to really take shape !
' style=

End view of the Hor. Stab.

End view of the Hor. Stab.

' style=

Plane level and everything checked 10 times !

Plane level and everything checked 10 times !

' style=

Vert stab on ....

Vert stab on ....

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.