Brief Description: Battery Tray and Elevator Bellcrank
Seperated battery channel parts and final drilled as required. Final drilled the battery bellcrank mount plate as required and countersunk the #40 holes for nutplates. Seperated the F635 bellcrank parts and deburred. Clecoed the bellcrank assembly together with bearing and spacer and drilled as indicated. Disassembled all parts, deburred and primed. Riveted bellcrank assembly together. Riveted nutplates to bellcrank mounting plate. Installed and riveted battery channels to mount plate.