Brief Description: Shear deck, angles and seat belt anchors
Final drilled all holes common to aft shear deck and underlying structure as indicated. Match drilled horizontal stab attach bar supprt and up elevator stop bracket to shear deck. Removed top skins and match drilled the F-636 shoulder belt anchors to L and R longerons. Final drilled left and right aft fuselage access cover plates.