After installing the flap drive. I continued fitting the baggage bay. The front is bonded to the cockpit module and the rib supports are bonded to the fuselage floor, first with Redux then 2 tapes of bid are added. Also 2 tapes of bib to either side of the baggage bay onto the fuselage sides. I also decided to make 2” wide flange around the top of the baggage bay, as I intend to bond the top on and everything together at the same time. The peal ply will be taken off just before bonding.