KitLog pro

Powered By Kitlog Pro v2.0

Michaels RV-8
' style=
Date:  3-1-2013
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Practice Project 1

Well I finally completed the first practice kit. It was my first attempt at riveting in very long time.

The sides turned out pretty good, but when I got around to the hinge I made several mistakes lining up the lid and body. Some of the dimples came out fine, other not so mush. All were done with the C-Frame and hammer. The hinge is set with AN426-3 rivets.

When it was time to install the handle I made a few more mistakes. The first, was not paying attention to the dimensions that was on the plans and bent the wire using the entire length. I drilled the four holes and riveted it place.

I drilled out the rivets, read the directions again, and re-bent the wire to the correct size. I drilled four new holes and riveted the handle back on. The five holes that I drilled in the top, I placed cut down rivets in and set them. Now on to the next practice kit.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.