Powered By Kitlog Pro v2.0
Michaels RV-8
RV-8
All
6-4-2013
< Previous Log Entry
Next Log Entry >
Date:
6-4-2013
Number of Hours:
2.50
Manual Reference:
Brief Description:
Vertical Stabilizer Begins 2
Cleco'd the ribs and spars together and drilled to #30’s. This sub structure goes together pretty fast, not much to it.
Time to final drill the rear spar to #30's. Be sure to clap the structure down to the table while performing this task.
Next was to Cleco the VS-801PP skin to the skeleton.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
89
201
Elevators
4
12
Empennage
1
2
Horiz. Stabilizer
23
100
How it Started
3
Miscellaneous
1
My Inspiration
3
Practice Kits
11
Rudder
14
45
Shop Supplies
2
Tools
7
2
Vertical Stabilizer
13
40
Workshop
7
Copyright © 2001-2024 Matronics. All Rights Reserved.