KitLog pro

Powered By Kitlog Pro v2.0

Michaels RV-8
' style=
Date:  6-4-2013
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Vertical Stabilizer Begins 2

Cleco'd the ribs and spars together and drilled to #30’s. This sub structure goes together pretty fast, not much to it.

Time to final drill the rear spar to #30's. Be sure to clap the structure down to the table while performing this task.

Next was to Cleco the VS-801PP skin to the skeleton.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.