KitLog pro

Powered By Kitlog Pro v2.0

Michaels RV-8
' style=
Date:  6-5-2013
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Match Drilling the Vertical Stabilizer

Close up of the tip rib VS-706 all Cleco’d in and ready to match drill to #40.

The next step that the construction manual has you to do is drill all the holes in the VS-801PP skin. The rivets used to fasten the skin are AN426AD3-3.5 which called for the holes to be drilled to size 40.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.