KitLog pro

Powered By Kitlog Pro v2.0

Michaels RV-8
' style=
Date:  6-3-2013
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Vertical Stabilizer Begins 1

I was able to start on the Vertical Stabilizer this week. First step, identify all the parts and laid them all out. Once that was done, per the construction manual, I Cleco'd the rear spar VS-803PP to the spar doubler VS-808PP along with the rudder hinges VS-410PP, VS-411PP, and VS-412PP. Each bracket was then drilled to size #30.

All the parts for the skeleton (sub structure) are laid out awaiting “Edge Finishing”, “Fluting and Straightening”.

Preparing the ribs is a slow mindless task, but it is all part of the big picture.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.